    As an indispensable building material in the home, lamps and lanterns not only bring light to people, but also play a decorative role. Therefore, many people make small mistakes in the use and layout of lamps and lanterns, resulting in problems such as unusable installation.

 

This article contains the following:

  • Installation steps for project light

  • Project lighting installation skills

  • Precautions of installing project light

 

1.Installation steps for project light

(1). Project lamp inspection

Check the installation accessories of the project lamp, see whether the manufacturer's relevant documents and technology are complete, and see if the appearance of the project lamp is damaged, whether there is deformation, metal shedding, corrosion and other phenomena.

(2). Assemble lamps

Connect the lamp parts into one, the length of the threading of the lamp should be appropriate, and the extra wire should be tinned, pay attention to distinguish the live wire and the zero wire, and straighten the line.

(3). Lamp installation

The power cord of the project light should be kept enough, then cut the remaining wire, strip the wire end, and then install the lamp holder on the junction box with screws.

(4). Power-on trial operation

    After the installation is complete, turn on the power and check whether it is energized.

 

2.Project lighting installation skills

(1). It is best to install a sub-control switch for the installation of lamps and lanterns, which can save a lot of trouble. If there is only one main switch, several project lamps are turned on and off at the same time, so that other lamps cannot be controlled, which is very troublesome.

(2). It is best to set the project light to be adjustable, so that when the light is dim or dazzling, it can be adjusted to make people feel more comfortable.

(3). The tone of the project light should be soft and consistent with that of the living room.

(4). For kitchen lamps, it is best to install a few more to form a multi-level lighting system.

(5). If the space is high enough, you can install a transparent or translucent chandelier as a light source, which can not only provide lighting, but also play a decorative effect.

(6). The lamp should be installed firmly. When the installation is completed, you can use your hand to see if it is firm. The bottom cover of the lamp should be close to the ceiling and cannot be shaken.

 

3.Precautions of installing project light

    For the grounding protection of lamps, there must be a special grounding screw for lamps and a washer and spring washer should be pressed tightly.

    When the bulb capacity is less than 100W, plastic lamp caps, porcelain lamp caps for 100W or more and moisture-proof enclosed lamps can be used.

    When all kinds of lamps are installed in flammable parts, they must be well ventilated and heat dissipated and must be fireproofed and insulated.

    The installation of light fixtures in the light steel keel ceiling can not make the light steel keel bear the load. Any light fixture with a weight of less than 3kg must be installed on the main keel, and those with a weight of 3kg or more must be pre-buried with iron fittings.

    Before replacing a project light, you need to pay attention to buying a suitable size of light bulbs and lamps. You can disassemble the old lamp first, take it to the hardware store for comparison, and buy a project lamp of the same size. You can also observe whether there are any marked models on your old lamps. Then choose according to the specifications and models.


    Pay special attention to safety issues when replacing lamps, first turn off the main safety switch, remove the old lamps, and then install new lamps. After power on, turn on the switch to check whether the installation is correct.


    If you want to buy European lights, luxury lights,please contact the KAMABLE.


  • Q What products certificates do we have

    A
    GS, CE, RoHS for general Europe market. ETL & CETL for USA and Canada. BS for UK. And PSE for Japan.
  • Q Delivery method

    A
    By sea preferred, also by air and courrier are available, too.
  • Q Payment terms

    A
    T/T preferred, but also L/C, Western Union
  • Q MOQ

    A
    We can be exporter, wholesaler, or even retailer to you, The MOQ can be less, but depend on the items.
  • Q Delievery time

    A
    For container order, generally 25-30 days. For sample orders sometimes within 7-14 days.

CONTACT US

Address: 306, building 4, No. 9 Boai Third Road, Shiqi District, Zhongshan City, Guangdong Province, China
Tel: +86-760-88222142 
Fax: +86-760-86746845
Contact Person: Andy Kam (Business Manager)
Skype: kamable1 
WHATSAPP/WECHAT:+86-15913306128  
Cell Phone: +86-15913306128

STYLE

MATERIAL

FEEDBACK
Copyright © 2017  Kamable Lighting Co., Ltd. Site Map